Delivered 234 circuit upgrades and migrations across BT exchanges nationwide, saving £740k of equipment through tight planning, RAIDC management and CRM tracking.

Client
Sky
Role
Project Coordinator — LLU
Duration
National rollout phase
Local Loop Unbundling Delivery
Context

The brief

National LLU rollout requiring coordination of physical circuit migrations across BT exchanges, with hard equipment cost exposure.

Challenge

What was at stake

  • Hundreds of circuits with tight migration windows.
  • Equipment cost leakage if migrations slipped or duplicated.
  • CRM data quality undermining delivery tracking.
Approach

How I delivered

  • Built a master migration schedule with daily progress tracking.
  • Tightened RAIDC management around exchange-by-exchange dependencies.
  • Cleaned CRM data and embedded a single delivery dashboard.
Outcomes

Measurable impact

234
Circuit upgrades and migrations delivered
£740k
Equipment cost saved through tight planning
On schedule
Nationwide BT exchange coverage